-After the 1st Antarctic observation, the second remodeling and the third remodeling were carried out on Soya.
-The front deck is flat with no notches on the port side.
-Addition of large helicopter departure and arrival deck.
-Expansion of the overhang on the side of the bridge.
-Expansion of the front gate type mast and movement of the rear gate type mast.
-Equipped with a thin bilge keel with one side divided into four.
-Equipped with a large helicopter, etc.
-Especially in the third refurbishment, efforts are being made to strengthen air transportation capacity by large helicopters, and even if Soya can not approach the base due to bad weather conditions, it will be possible to sufficiently transport people and goods. It was
-The kit newly develops the upper part of the hull, bridge, deck, heli deck, gate type mast, etc.
-Onboard aircraft are newly equipped with seaplane DHC-2 (1 aircraft) and helicopter Sikorsky S-58 (2 aircraft).
-1/32 scale Taro Jiro and observer metal figure set as a privilege only for the first shipment.
-Add new mold.